{"product_id":"500kw-gas-powered-air-cooled-mining-container-140-slot","title":"500kW Gas-Powered Air-Cooled Container — 140 Slots","description":"\u003c!-- IMAGE PLACEHOLDER 1 (main): exterior of the container, white background --\u003e\n\u003c!-- IMAGE PLACEHOLDER 2: interior showing the 140 air-cooled slots --\u003e\n\u003c!-- IMAGE PLACEHOLDER 3: generator sets and switchgear --\u003e\n\u003c!-- IMAGE PLACEHOLDER 4: ventilation and airflow arrangement --\u003e\n\u003c!-- IMAGE PLACEHOLDER 5: container installed on site --\u003e\n\n\u003ch3\u003eOverview\u003c\/h3\u003e\n\u003cp\u003eThe air-cooled counterpart to our hydro container: two 250 kW natural gas generator sets powering 140 air-cooled slots, with ventilation, airflow management and networking built into the same 40-foot shell.\u003c\/p\u003e\n\u003cp\u003eAir cooling gets more slots into the same container — 140 against 96 — and costs substantially less, because there is no coolant loop, no pump group and no dry-cooler plant to buy. The trade is per-slot power: air handles standard hardware comfortably and runs out of headroom under overclocking or at GPU-node densities. If your fleet is standard air-cooled units, this is the cheaper and denser choice, and the difference is not marginal.\u003c\/p\u003e\n\n\u003ch3\u003eWhy teams choose it\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003e140 slots against 96\u003c\/strong\u003e — air cooling fits more hardware in the same shell.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubstantially cheaper\u003c\/strong\u003e — no coolant loop, pump group or dry coolers.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e500 kW self-generated\u003c\/strong\u003e — two 250 kW gas sets integrated.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eManaged airflow\u003c\/strong\u003e — ventilation and containment engineered, not improvised.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eTypical applications\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eStandard air-cooled fleets at remote gas sites\u003c\/li\u003e\n\u003cli\u003eLowest capital cost per slot in an off-grid deployment\u003c\/li\u003e\n\u003cli\u003eSites where overclocking is not part of the plan\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eWhat you get from Kentino\u003c\/h3\u003e\n\u003cp\u003eKentino supplies, configures and supports this system as part of a complete deployment: site and load assessment, gas supply and emissions requirements, electrical design, EU-based logistics and warranty. On-site generation carries permitting and emissions obligations that vary by country — our engineers will walk through what applies to your location before you order.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eLead time and freight are quoted per project. Contact us for a full bill of materials and a delivery estimate to your site.\u003c\/em\u003e\u003c\/p\u003e","brand":"Kentino","offers":[{"title":"Default Title","offer_id":53650409619784,"sku":"KEN-PW-CT-50F","price":126500.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0843\/5479\/3800\/files\/500kw-gas-powered-air-cooled-mining-container-140-slot.jpg?v=1785933612","url":"https:\/\/kentino.com\/it\/products\/500kw-gas-powered-air-cooled-mining-container-140-slot","provider":"Kentino","version":"1.0","type":"link"}