{"title":"Power \u0026 energy","description":"\u003cp class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\"\u003ePower is usually the real constraint on an AI or mining deployment — not hardware availability. Our range covers rack PDUs, three-phase distribution, online UPS systems and standalone generator sets from 250 kVA to 1 MW.\u003c\/p\u003e\n\u003cp class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\"\u003eWe size the electrical side against your actual load profile, including headroom for expansion, and advise on redundancy where uptime matters. Supplied and supported from the EU.\u003c\/p\u003e","products":[{"product_id":"250kw-natural-gas-generator-set-20ft","title":"250kW Natural Gas Generator Set — 20ft Containerised","description":"\u003c!-- IMAGE PLACEHOLDER 1 (main): exterior of the 20ft generator container, white background --\u003e\n\u003c!-- IMAGE PLACEHOLDER 2: interior showing engine and alternator --\u003e\n\u003c!-- IMAGE PLACEHOLDER 3: control panel detail --\u003e\n\u003c!-- IMAGE PLACEHOLDER 4: unit installed on site with gas connection --\u003e\n\n\u003ch3\u003eOverview\u003c\/h3\u003e\n\u003cp\u003eA 250 kW natural gas generator set built into a 20-foot container: engine, alternator, control panel, cooling and exhaust integrated and tested as one unit. Craned into position, connected to a gas supply and a load, and it runs.\u003c\/p\u003e\n\u003cp\u003eOn-site generation has stopped being an exotic option. Grid connection queues in most of Europe now run to years, and a project that cannot get power on a schedule is not a project. Generating behind the meter removes the queue entirely — and where the gas is stranded, flared or otherwise uneconomic to transport, the cost per kilowatt-hour undercuts anything available from the grid. That logic holds identically whether the load is a mining hall or a GPU cluster.\u003c\/p\u003e\n\n\u003ch3\u003eWhy teams choose it\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003e250 kW, containerised\u003c\/strong\u003e — engine, alternator, controls and cooling in one tested unit.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBypasses the grid queue\u003c\/strong\u003e — no connection application, no multi-year wait.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eModular by design\u003c\/strong\u003e — sets run in parallel as demand grows.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSuits stranded or flared gas\u003c\/strong\u003e — turns an uneconomic resource into compute.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eTypical applications\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eSites with gas available but no grid capacity\u003c\/li\u003e\n\u003cli\u003eFlare-gas and stranded-gas monetisation\u003c\/li\u003e\n\u003cli\u003eBridging power while a grid connection is pending\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eWhat you get from Kentino\u003c\/h3\u003e\n\u003cp\u003eKentino supplies, configures and supports this system as part of a complete deployment: site and load assessment, gas supply and emissions requirements, electrical design, EU-based logistics and warranty. On-site generation carries permitting and emissions obligations that vary by country — our engineers will walk through what applies to your location before you order.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eLead time and freight are quoted per project. Contact us for a full bill of materials and a delivery estimate to your site.\u003c\/em\u003e\u003c\/p\u003e","brand":"Kentino","offers":[{"title":"Default Title","offer_id":53650409423176,"sku":"KEN-PW-GEN-250","price":50600.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0843\/5479\/3800\/files\/250kw-natural-gas-generator-set-20ft.jpg?v=1785936086"},{"product_id":"1mw-natural-gas-generator-set-40hq","title":"1MW Natural Gas Generator Set — 40HQ Containerised","description":"\u003c!-- IMAGE PLACEHOLDER 1 (main): exterior of the 40HQ container, white background --\u003e\n\u003c!-- IMAGE PLACEHOLDER 2: interior showing four paralleled generator sets --\u003e\n\u003c!-- IMAGE PLACEHOLDER 3: switchgear and synchronisation panel --\u003e\n\u003c!-- IMAGE PLACEHOLDER 4: unit installed on site --\u003e\n\n\u003ch3\u003eOverview\u003c\/h3\u003e\n\u003cp\u003eFour 250 kW gas generator sets running in parallel inside a single 40-foot high-cube container, synchronised to deliver one megawatt. Switchgear, controls, cooling and exhaust are integrated; the unit arrives commissioned.\u003c\/p\u003e\n\u003cp\u003eParalleling four smaller engines rather than fitting one large one buys redundancy that a single-engine set cannot offer. Service one unit and you lose a quarter of capacity rather than all of it, and the plant follows load rather than running a big engine at partial output where efficiency falls away. For a 24\/7 workload — mining or AI inference, both of which punish downtime — that architecture is worth more than the headline rating.\u003c\/p\u003e\n\n\u003ch3\u003eWhy teams choose it\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003e1 MW from four paralleled sets\u003c\/strong\u003e — synchronised and commissioned before delivery.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRedundant by architecture\u003c\/strong\u003e — service one engine, keep 750 kW running.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFollows load\u003c\/strong\u003e — engines drop out at low demand instead of running inefficiently.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSingle 40HQ delivery\u003c\/strong\u003e — switchgear, controls and cooling included.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eTypical applications\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eMegawatt-scale sites without grid capacity\u003c\/li\u003e\n\u003cli\u003e24\/7 workloads where downtime is expensive\u003c\/li\u003e\n\u003cli\u003eAI compute sited next to a gas resource\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eWhat you get from Kentino\u003c\/h3\u003e\n\u003cp\u003eKentino supplies, configures and supports this system as part of a complete deployment: site and load assessment, gas supply and emissions requirements, electrical design, EU-based logistics and warranty. On-site generation carries permitting and emissions obligations that vary by country — our engineers will walk through what applies to your location before you order.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eLead time and freight are quoted per project. Contact us for a full bill of materials and a delivery estimate to your site.\u003c\/em\u003e\u003c\/p\u003e","brand":"Kentino","offers":[{"title":"Default Title","offer_id":53650409488712,"sku":"KEN-PW-GEN-1000","price":200376.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0843\/5479\/3800\/files\/1mw-natural-gas-generator-set-40hq.jpg?v=1785935541"},{"product_id":"500kw-gas-powered-hydro-mining-container-96-slot","title":"500kW Gas-Powered Hydro Cooling Container — 96 Slots","description":"\u003c!-- IMAGE PLACEHOLDER 1 (main): exterior of the container, white background --\u003e\n\u003c!-- IMAGE PLACEHOLDER 2: interior showing the 96 liquid-cooled slots --\u003e\n\u003c!-- IMAGE PLACEHOLDER 3: generator sets and switchgear --\u003e\n\u003c!-- IMAGE PLACEHOLDER 4: dry coolers mounted externally --\u003e\n\u003c!-- IMAGE PLACEHOLDER 5: container installed on a remote site --\u003e\n\n\u003ch3\u003eOverview\u003c\/h3\u003e\n\u003cp\u003eA single container that both generates its own power and cools the hardware it feeds: two 250 kW natural gas generator sets, 96 liquid-cooled slots, two high-efficiency micro-channel dry coolers rated for the full 500 kW, plus networking and ventilation.\u003c\/p\u003e\n\u003cp\u003eThis is the format for sites that have gas and nothing else — no grid, no building, no cooling infrastructure. Everything the deployment needs arrives on one truck and is commissioned as one system, which also means one supplier is answerable for the whole thing rather than three arguing about whose interface failed. The liquid-cooled slots take hydro ASICs today and liquid-cooled GPU nodes without mechanical change.\u003c\/p\u003e\n\n\u003ch3\u003eWhy teams choose it\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003ePower and cooling in one unit\u003c\/strong\u003e — 500 kW generated and rejected inside the same container.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e96 liquid-cooled slots\u003c\/strong\u003e — hydro ASICs or liquid-cooled GPU nodes.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMicro-channel dry coolers\u003c\/strong\u003e — two units rated for the full 500 kW load.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGenuinely off-grid\u003c\/strong\u003e — needs a gas supply and nothing else.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eTypical applications\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eRemote sites with gas but no grid connection\u003c\/li\u003e\n\u003cli\u003eFlare-gas monetisation with liquid-cooled hardware\u003c\/li\u003e\n\u003cli\u003eFast off-grid AI or mining capacity\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eWhat you get from Kentino\u003c\/h3\u003e\n\u003cp\u003eKentino supplies, configures and supports this system as part of a complete deployment: site and load assessment, gas supply and emissions requirements, electrical design, EU-based logistics and warranty. On-site generation carries permitting and emissions obligations that vary by country — our engineers will walk through what applies to your location before you order.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eLead time and freight are quoted per project. Contact us for a full bill of materials and a delivery estimate to your site.\u003c\/em\u003e\u003c\/p\u003e","brand":"Kentino","offers":[{"title":"Default Title","offer_id":53650409554248,"sku":"KEN-PW-CT-50H","price":187220.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0843\/5479\/3800\/files\/500kw-gas-powered-hydro-mining-container-96-slot.png?v=1785934168"},{"product_id":"500kw-gas-powered-air-cooled-mining-container-140-slot","title":"500kW Gas-Powered Air-Cooled Container — 140 Slots","description":"\u003c!-- IMAGE PLACEHOLDER 1 (main): exterior of the container, white background --\u003e\n\u003c!-- IMAGE PLACEHOLDER 2: interior showing the 140 air-cooled slots --\u003e\n\u003c!-- IMAGE PLACEHOLDER 3: generator sets and switchgear --\u003e\n\u003c!-- IMAGE PLACEHOLDER 4: ventilation and airflow arrangement --\u003e\n\u003c!-- IMAGE PLACEHOLDER 5: container installed on site --\u003e\n\n\u003ch3\u003eOverview\u003c\/h3\u003e\n\u003cp\u003eThe air-cooled counterpart to our hydro container: two 250 kW natural gas generator sets powering 140 air-cooled slots, with ventilation, airflow management and networking built into the same 40-foot shell.\u003c\/p\u003e\n\u003cp\u003eAir cooling gets more slots into the same container — 140 against 96 — and costs substantially less, because there is no coolant loop, no pump group and no dry-cooler plant to buy. The trade is per-slot power: air handles standard hardware comfortably and runs out of headroom under overclocking or at GPU-node densities. If your fleet is standard air-cooled units, this is the cheaper and denser choice, and the difference is not marginal.\u003c\/p\u003e\n\n\u003ch3\u003eWhy teams choose it\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003e140 slots against 96\u003c\/strong\u003e — air cooling fits more hardware in the same shell.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubstantially cheaper\u003c\/strong\u003e — no coolant loop, pump group or dry coolers.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e500 kW self-generated\u003c\/strong\u003e — two 250 kW gas sets integrated.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eManaged airflow\u003c\/strong\u003e — ventilation and containment engineered, not improvised.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eTypical applications\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eStandard air-cooled fleets at remote gas sites\u003c\/li\u003e\n\u003cli\u003eLowest capital cost per slot in an off-grid deployment\u003c\/li\u003e\n\u003cli\u003eSites where overclocking is not part of the plan\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eWhat you get from Kentino\u003c\/h3\u003e\n\u003cp\u003eKentino supplies, configures and supports this system as part of a complete deployment: site and load assessment, gas supply and emissions requirements, electrical design, EU-based logistics and warranty. On-site generation carries permitting and emissions obligations that vary by country — our engineers will walk through what applies to your location before you order.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eLead time and freight are quoted per project. Contact us for a full bill of materials and a delivery estimate to your site.\u003c\/em\u003e\u003c\/p\u003e","brand":"Kentino","offers":[{"title":"Default Title","offer_id":53650409619784,"sku":"KEN-PW-CT-50F","price":126500.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0843\/5479\/3800\/files\/500kw-gas-powered-air-cooled-mining-container-140-slot.jpg?v=1785933612"}],"url":"https:\/\/kentino.com\/ru\/collections\/power-energy.oembed","provider":"Kentino","version":"1.0","type":"link"}